Cycle Time is a measure of how long it takes to get a new feature in a
software system from idea to running in production. In Agile circles, we try
to minimize cycle time. We do this by defining and implementing very small
features and minimizing delays in the development process. Although the rough
notion of cycle time, and the importance of reducing it, is common, there is a
lot of variations on how cycle time is measured.

A key characteristic of agile software development is a shift from a
Waterfall Process, where work is decomposed based on
activity (analysis, coding, testing) to an Iterative Process where work is
based on a subset of functionality (simple pricing, bulk discount,
valued-customer discount). Doing this generates a feedback loop where we can learn
from putting small features in front of users. This learning allows us to
improve our development process and allows us to better understand where the
software product can provide value for our customers.

This feedback is a core benefit of an iterative approach, and like most
such feedback loops, the quicker I get the feedback, the happier I am. Thus
agile folks put a lot of emphasis on how fast we can get a feature through the
entire workflow and into production. The phrase cycle time is a measure of that.

But here we run into difficulties. When do we start and stop the clock on
cycle time?

The stopping time is the easiest, most glibly it’s when the feature is put
into production and helping its users. But there are circumstances where this
can get muddy. If a team is using a Canary Release, should it
be when used by the first cohort, or only when released to the full
population? Do we count only when the app store has approved its release, thus
adding an unpredictable delay that’s mostly outside the control of the
development team?.

The start time has even more variations. A common marker is when a
developer makes a first commit to that feature, but that ignores any time
spent in preparatory analysis. Many people would go further back and say:
“when the customer first has the idea for a feature”. This is all very well
for a high priority feature, but how about something that isn’t that urgent,
and thus sits in a triage area for a few weeks before being ready to enter
development. Do we start the clock when the team first places the feature on
the card wall
and we start to seriously work on it?

I also run into the phase lead time, sometimes instead of
“cycle time”, but often together – where people make a distinction between the
two, often based on a different start time. However there isn’t any
consistency between how people distinguish between them. So in general, I
treat “lead time” as a synonym to “cycle time”, and if someone is using both,
I make sure I understand how that individual is making the distinction.

The different bands of cycle time all have their advantages, and it’s often
handy to use different bands in the same situation, to highlight differences.
In that situation, I’d use a distinguishing adjective (e.g. “first-commit cycle
time” vs “idea cycle time”) to tell them apart. There’s no generally accepted
terms for such adjectives, but I think they are better than trying to
create a distinction between “cycle time” and “lead time”.

What these questions tell us is that cycle time, while a useful concept, is
inherently slippery. We should be wary of comparing cycle times between teams,
unless we can be confident we have consistent notions of their stop and start times.

But despite this, thinking in terms of cycle time, and trying to minimize
it, is a useful activity. It’s usually worthwhile to build a value stream map
that shows every step from idea to production, identifying the steps in the
work flow, how much time is spent on them, and how much waiting between them.
Understanding this flow of work allows us to find ways to reduce the cycle
time. Two commonly effective interventions are to reduce the size of features
and (counter-intuitively) increase Slack. Doing the work to
understand flow to improve it is worthwhile because
the faster we get ideas into production, the more
rapidly we gain the benefits of the new features, and get the feedback to
learn and improve our ways of working.

Acknowledgements

Andrew Harmel-Law, Chris Ford, James Lewis, José Pinar, Kief Morris, Manoj Kumar M, Matteo
Vaccari, and Rafael Ferreira discussed this post
on our internal mailing list